Skip to main content

How do you migrate an application to AWS?

How to migrate applications to AWS: assess, mobilize, migrate and modernize, the seven migration strategies (7 Rs), timelines, costs and common pitfalls.

short answer

Short answer

To migrate an application to AWS, assess it and its dependencies, choose a migration strategy (such as rehost, replatform or refactor), prepare a secure AWS landing zone, replicate data and test the application on AWS, then cut over in a planned window with a rollback plan. After migration, rightsize and optimize based on real usage.

By the Celestibia Solutions engineering team · Published

The AWS migration process

  1. Assess

    Inventory servers, applications, databases and dependencies, and build a business case.

  2. Mobilize

    Create the landing zone (accounts, networking, identity, security baseline), set up migration tooling and run a pilot.

  3. Migrate

    Move applications in waves, replicate data, test, then cut over with a rehearsed runbook and rollback plan.

  4. Optimize and modernize

    Rightsize from real metrics, apply Savings Plans, and modernize components that benefit most.

The seven migration strategies (the 7 Rs)

  1. Rehost

    Lift and shift servers to EC2 with minimal change, often using AWS Application Migration Service.

  2. Relocate

    Move VMware-based workloads to VMware Cloud on AWS without changing them.

  3. Replatform

    Lift, tinker and shift: for example, move a database to Amazon RDS or an app into containers.

  4. Refactor

    Re-architect for cloud-native services such as microservices on EKS or serverless.

  5. Repurchase

    Replace with a SaaS product.

  6. Retire

    Decommission applications that are no longer needed.

  7. Retain

    Keep some workloads where they are for now.

How long and how much

A simple lift-and-shift of a small application can take two to four weeks; full modernization with re-architecture, containers and CI/CD typically takes two to four months. Cost depends on the number of applications, data volumes and the amount of modernization. AWS offers migration funding programs for eligible projects through partners.

Common pitfalls

  • Copying on-premises server sizes instead of rightsizing.
  • Skipping the landing zone and fixing security later.
  • Undiscovered dependencies breaking during cutover.
  • No tested rollback plan.

Key takeaways

  • Assess first: dependencies decide the wave plan.
  • Pick a strategy per application; not everything should be refactored.
  • Most savings come after migration, from rightsizing on real data.

Related questions

What is the fastest way to migrate to AWS?

Rehosting with AWS Application Migration Service is usually fastest because it replicates servers with minimal change. It should be followed by rightsizing and selective modernization.

How does Celestibia perform AWS migrations?

Celestibia assesses, builds the landing zone, proves the process with a pilot, migrates in planned waves with rehearsed cutovers and rollback plans, and then optimizes cost and performance on AWS.

How Celestibia helps

Further reading

Want this applied to your environment?

A Celestibia engineer can review your setup and turn this guidance into a concrete plan. The first assessment is free.

What happens next

  1. Answer six questions about your cloud setup, spend and priorities. It takes about three minutes.
  2. A Celestibia engineer reviews your answers within one business day.
  3. You get tailored recommendations and the AWS programs you are likely to qualify for.

Monday to Friday, 10 AM to 7 PM IST